Measurements & Materials

Fence Panel & Post Planner

Count straight-run sections, posts, rails and panels.

Your details

Use your own job numbers

Worked example

See the calculation with sample numbers

A 56 ft open straight run with an 8 ft maximum span needs 7 panels, 8 posts, and 14 rails when each panel uses 2 rails.

What can change the result?

This first version does not infer gates, corners, shared endpoints, property boundaries, or local code requirements.

How this was calculated: Panels, open-run posts, rails, total run length, assumptions.